The Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. ... Roadway Construction » Section 315 - Asphalt Concrete Pavement Advanced . Filter by Division, for a Section by ...
View MoreThe Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. Section 315 - Asphalt Concrete Pavement (NON SUPERPAVE) Regional Construction Standards Hampton Roads Regional Construction Standards
View MoreDecember 2010 315 - 1 SECTION 315 . ASPHALT CONCRETE PAVEMENT – NON SUPERPAVE . I. GENERAL 1.1 DESCRIPTION OF WORK . The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall perform all Work necessary for constructing one or
View Morebid for asphalt concrete. Q. Asphalt driveway replacement will be measured and paid per square yard of the specified thickness (in inches) of base and asphaltic materials as identified in the Contract Documents; or, for each driveway replaced, as indicated on the Bid form. End of Section . June 2016 315 - 5
View MoreThe Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. Hampton Roads Regional Construction Standards HRRCS ... Roadway Construction » Section 315A - Asphalt Concrete Pavement (SUPERPAVE)
View MoreSpecifications – Section 315 • Section 315 ASPHALT CONCRETE PAVEMENT •Warm Mix temperatures Add minimum of 200oF • Takeaway: Finalize decisions, target spring 2014 contracts for inclusion where appropriate.
View Morebid for asphalt concrete. Q. Asphalt driveway replacement will be measured and paid per square yard of the specified thickness (in inches) of base and asphaltic materials as identified in the Contract Documents; or, for each driveway replaced, as indicated on the Bid form. End of Section . June 2016 315 - 5
View MoreThe Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. Hampton Roads Regional Construction Standards HRRCS ... Roadway Construction » Section 315A - Asphalt Concrete Pavement (SUPERPAVE)
View MoreThe Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. ... Section 315 - Asphalt Concrete Pavement. Division 3 - Roadway Construction. 06-01-2016 June 01, 2016. Section 317 - Pavement Patching. Division 3 - Roadway Construction.
View MoreSpecifications – Section 315 • Section 315 ASPHALT CONCRETE PAVEMENT •Warm Mix temperatures Add minimum of 200oF • Takeaway: Finalize decisions, target spring 2014 contracts for inclusion where appropriate.
View MoreThe Regional Construction Standards,is a reference manual of uniform construction standards for improvements in public rights-of-way. ... Section 315 - Asphalt Concrete Pavement (NON SUPERPAVE) 5th Edition. Division 3 - Roadway Construction. 12-01-2010 December 01, 2010. Section 315A - Asphalt Concrete Pavement (SUPERPAVE)
View MoreAsphalt Concrete Pavement: The asphalt concrete pavement shall be installed in accordance with Standard Detail 25.18. Compact to the density specified in VDOT Road and Bridge Specifications, Section 315 Asphalt Concrete Pavement, latest revision. Lift thickness shall not exceed those as referenced within these specifications.
View More• Section 317: Asphalt Milling • Section 321: Placement and Construction ofAsphalt Concrete Pavement • Section 332: Placement and Construction ofAsphalt Emulsion Slurry Seal Coat • Section 505: Concrete Structures • Section 610: Water Line Construction Changes made in the previous 2013 Revision to the 2012 Edition
View More• Section 321: Asphalt Concrete Pavement • Sections 325 and 717: Asphalt Rubber Specifications • Sections 332 and 715: Slurry Seal Material and . Applications • Sections 334 and 718: Preservative Seal for Asphalt Concrete • Section 335: Hot Asphalt Rubber Seal (Chip) •
View MoreMill and inlay a portion of the existing asphalt overlay section (single or multi-course). 3. Completely remove and replace the existing asphalt overlay section. 4. Completely remove the existing asphalt overlay section, rubblize or crack seat the underlying concrete pavement, and then construct a new asphalt overlay section.
View MoreAug 21, 2003 Section 504 — Asphalt Pavement 526 Section 505 — Asphalt Patches 542 Section 506 — Gap-Graded Stone Matrix Asphalt 547 Section 507 — Slurry Seal and Micro-Surfacing 550 Section 508 — Milling Asphalt Pavement 558 Section 509 — Diamond Grinding 562 Section 510 — Filling and Sealing Cracks and Joints in Asphalt Pavements 564
View MoreSpecifications – Section 315. Section 315 ASPHALT CONCRETE PAVEMENT. Warm Mix temperatures Add minimum of 200oF. Takeaway: Finalize decisions, target spring 2014 contracts for inclusion where appropriate.
View MoreThe paving asphalt for this project shall be PG 64-10. 203-6 ASPHALT CONCRETE. 203-6.1 General. (Add the following) Asphalt shall contain a maximum Recycled Asphalt Pavement (RAP) of 15%. 203-6.4 Asphalt Concrete Mixtures.
View More1.1 Work Included This section specifies requirements for constructing asphalt concrete pavement. Work includes fine grading, supply and placing of tack coat, hot mix asphalt concrete, and pavement markings. 1.2 Related Sections .1 Concrete Section 03 30 00 .2 Earthwork Section 31 20 00 .3 Walks, Curbs and Gutters Section 32 16 00
View More• Section 321: Asphalt Concrete Pavement • Sections 325 and 717: Asphalt Rubber Specifications • Sections 332 and 715: Slurry Seal Material and . Applications • Sections 334 and 718: Preservative Seal for Asphalt Concrete • Section 335: Hot Asphalt Rubber Seal (Chip) •
View MoreSD 315 mso.mat 9-21 In Place Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance having the capacity to weigh any sample which may be
View More• Detail 315: POLYMER CONCRETE WATER METER BOX COVER • Detail 319: TRAFFIC RATED BOX AND COVER ... Placement and Construction of Asphalt Concrete Pavement • Section 324: Portland Cement Concrete Pavement ... In the interest of regional uniformity, it is hoped that all using agencies will adopt these standards with minimal changes. ...
View More315. Asphalt Concrete Pavement (NON SUPERPAVE) 315-1 to 315-14 315A. Asphalt Concrete Pavement (SUPERPAVE) 315A-1 to 315A-14 317 Pavement Patching 317-1 to 317-3 DIVISION 4 - MISCELLANEOUS Section 400 Division Table of Contents 400-1 406 Reinforcing Steel 406-1 to 406-4 414. Riprap 414-1 to 414-6 DIVISION 5 - INCIDENTAL CONSTRUCTION Section
View More• Section 321: Asphalt Concrete Pavement • Sections 325 and 717:Asphalt Rubber Specifications • Sections 332 and 715: Slurry Seal Material and Applications ... In the interest of regional uniformity, it is hoped that all using agencies will adopt these standards with minimal changes. ... 315-1
View MoreRegional Standards, Fifth Edition, December 2010, as amended, which may be obtained from: ... Section 107 - Legal Relations and Responsibility to the Public I Permits and Regulations 107-1 ... 315. Asphalt Concrete Pavement (NON SUPERPAVE) 315-1 to 315-14 315A. Asphalt Concrete Pavement (SUPERPAVE) 315A-1 to 315A-14 ...
View MoreGUIDELINES — All projects requiring asphalt concrete pavement. {2007-c315i00} cn315-000100-00 SECTION 315.05(c) PLACING AND FINISHING is modified by replacing the third paragraph with the following: The longitudinal joint in one layer shall offset that in the layer immediately below by approximately 6 inches or more.
View More• Section 321: Asphalt Concrete Pavement • Sections 325 and 717: Asphalt Rubber Specifications • Sections 332 and 715: Slurry Seal Material and . Applications • Sections 334 and 718: Preservative Seal for Asphalt Concrete • Section 335: Hot Asphalt Rubber Seal (Chip) •
View MoreThere are significant challenges to managing resources for the reuse or recycling of reclaimed asphalt pavement (RAP) and recycled concrete aggregate (RCA). In rural areas, the reclaiming and recycling of aggregates can be done on a project-by-project basis, ensuring more consistent quality, but it is expensive and inefficient to move these low ...
View MoreThin Hot Mix Asphalt Concrete Overlay Preventative Maintenance Overlay and Bonding Agent for Composite Pavement Rehab • Requires a specialized spray-bar paver or hot applied polymer modified tack • Tack application rate is .25 +/- (0.03) Gal/sq yd • Delivery temperature is 315 oF +/- 15 F measured in the paver hopper • Base Temperature 50oF or higher
View More315 Asphalt Concrete Pavement (NON SUPERPAVE)** 315-1 to 315-14 315A Asphalt Concrete Pavement (SUPERPAVE)** 315A-1 to 315A-14 317 Pavement Patching** 317-1 to 317-3 DIVISION 4 – MISCELLANEOUS Section 400 Division Table of Contents** 400-1 406 Reinforcing Steel** 406-1 to 406-4 414 Riprap** 414-1 to 414-6 DIVISION 5 – INCIDENTAL ...
View MoreSep 14, 2016 The full depth asphalt concrete pavement section will be constructed with 10.5” HMA as base, binder, and top course asphalt placed on a 9” recycled concrete aggregate (RCA) subbase layer. The proposed 50 foot wide roadway section will be constructed as a full depth asphalt concrete section, which will include a
View Moreshall be constructed in accordance with section 315.00 of the standard specifications for public works construction. all asphalt concrete pavements shall conform to section 201.00 and shall be constructed in accordance with section 310.00 of the standard specifications for public works construction.
View MorePlaning (Milling) Aspalt Concrete Operations, October 1, 2012, Section III.A: “Performance planed surfaces must be paved back within 14 calendar days from the start of the performance planing operation.The Contractor is required to perform pavement
View MorePlaning (Milling) Aspalt Concrete Operations, October 1, 2012, Section III.A: “Performance planed surfaces must be paved back within 14 calendar days from the start of the performance planing operation.The Contractor is required to perform pavement